Free sample lesson · 6 min

How big is too big? Setting materiality

ACCA Audit and Assurance6 min readFree sample

24modules
125syllabus outcomes
2timed mock exams
Freesample lesson
Step 1 of 5

Meet the problem

Meet Lena

Lena is planning the audit of Harbour Prints, a printing company with a profit before tax of $2,400,000. Her team will find errors. Which ones matter, and how big is too big?

In simple words
  • Materiality is the auditor's line for an error big enough to matter.
  • Overall materiality comes from a benchmark and a percentage.
  • Performance materiality sits below it; errors below the clearly trivial level are not listed.

You already know: You already do this with a monthly budget: a $1 slip does not matter, a $200 slip does. Somewhere between them is your own line.

The idea in plain words

✗ No line at allTest every transaction to be safeThe team runs out of time and still cannot test everything.
! One line onlyUse overall materiality for everythingSmall errors the team misses can add up past it unseen.
✓ Three levelsOverall, performance and clearly trivialEvery error found has a clear place on the list or off it.

Setting materiality in four steps

A

Pick a benchmark

A figure the users of the accounts watch

B

Overall materiality

Benchmark times the firm's percentage

C

Performance materiality

Set lower, to cover errors not found

D

Clearly trivial

Below this, errors are not listed

Write the three levels into the audit plan before any testing starts.

Lena's three levels

✗ Before

Any error under $120,000 does not matter, so the team can ignore it.

Fix it step by step

AProfit before tax $2,400,000Pick a benchmark
B5% of $2,400,000 = $120,000Overall materiality
C75% of $120,000 = $90,000Performance materiality
D5% of $120,000 = $6,000Clearly trivial
✓ After

Errors above $6,000 are listed and added up. The total is compared with $120,000, and testing is planned at $90,000 so that errors not found are covered.

What the three levels give Lena

A line she can explain

Each level comes from a stated benchmark and percentage.

A clean list

Only errors above $6,000 are listed: $83,000 so far.

A clear conclusion

$83,000 is below $120,000, with $37,000 of room left.

Try it and remember

Myth

An error below materiality can always be ignored.

Fact

Errors are added together, so several small ones can become material. Some errors matter because of what they are, not their size, such as an error that turns a loss into a profit. Size is only the first test.

Your turn. Think of a monthly household budget of $2,000. Which mistake would you notice: $1, $20 or $200? Where would you draw your own line, and why?

Check yourself

1Another client has a stable profit before tax of $1,800,000. Using 5 percent, what is overall materiality, and what is performance materiality at 75 percent of it?

Answer: Overall materiality is $90,000 (5 percent of $1,800,000). Performance materiality is $67,500 (75 percent of $90,000).

2In the example, the team finds one more error of $4,800. Does it go on the list of uncorrected misstatements?

Answer: No. It is below the clearly trivial level of $6,000, so it is not added to the list.

3In the example, the client will not correct the two listed errors, and the team then finds a $41,000 error in payables. Are the uncorrected errors now material in total?

Answer: Yes, on size. $52,000 plus $31,000 plus $41,000 is $124,000, which is above overall materiality of $120,000. The auditor asks the client to correct them. If the client will not, the auditor's opinion is affected.

Remember
  • Overall materiality is a benchmark times a percentage, for example 5 percent of profit before tax.
  • Performance materiality is set lower; errors below the clearly trivial level are not listed.
  • Listed errors are added up and compared with overall materiality, by size and by nature.
Full course ACCA Audit and AssuranceSee the course

© 2026 Core Knowledge Training and Consultancy (Pty) Ltd, trading as Core Knowledge Digital · Reg. 2025/415020/07. All rights reserved.